Watch as I (together with so many others) rebuild an entire tank that sprung a leak.
~~~~~~~~
Demolition and Build:
The "Insert" (The climbey part) Sculpt:
~~~~~~~~
The floor plates (pebbles) are designed to have less rocks to clean and haul during major cleanouts, and make it easier to siphon out detritus for more regular cleanings.
https://youtu.be/9Zn6BA88QJ4
The "look" of the inserts came from another build that did not come to fruition when funding fell through











